A scratch org per pull request

Every PR gets a fresh org, deploys into it, runs the tests and destroys it. The setup took two days and removed an entire category of release-day panic.

Before: someone deployed to the shared integration org, discovered a conflict, and the next four people were blocked while it was untangled. Release day was a war room.

After: every pull request spins up its own scratch org, deploys into it, runs the full test suite, and destroys the org when the PR closes. Nobody blocks anybody.

The workflow

name: Validate PR
on: [pull_request]

jobs:
  scratch:
    runs-on: ubuntu-latest
    steps:
      - uses: actions/checkout@v4

      - name: Install the CLI
        run: npm install --global @salesforce/cli

      # The Dev Hub auth URL lives in a repository secret. It is the only
      # credential in the whole pipeline, and it never touches the log.
      - name: Authenticate to the Dev Hub
        run: |
          echo "$" > auth.txt
          sf org login sfdx-url --sfdx-url-file auth.txt --set-default-dev-hub
          rm auth.txt

      - name: Create the scratch org
        run: sf org create scratch -f config/project-scratch-def.json -a ci -d 1 -y 1

      - name: Push and test
        run: |
          sf project deploy start -o ci
          sf apex run test -o ci --code-coverage --result-format human --wait 20

      # `always()` matters: without it a failed test leaves the org alive and
      # the daily scratch-org limit is gone by Thursday.
      - name: Delete the scratch org
        if: always()
        run: sf org delete scratch -o ci --no-prompt

The parts that are not obvious

Scratch org limits are the real constraint. A Dev Hub has a daily and an active allocation, and a busy repository will hit both. Setting the duration to one day rather than the default seven is most of the fix; the always() cleanup step is the rest.

Do not skip the cleanup

A workflow that deletes the org only on success will, within a week, be a workflow that cannot create orgs at all — because every failed run has left one behind.

Test data has to come from somewhere. A scratch org is genuinely empty. Either every test builds its own data with a factory, or you maintain a seed plan under data/. We started with the seed plan, then moved to factories because the plan drifted from the schema and nobody noticed until it broke.

It is slower than you want. Ours takes eleven minutes end to end, most of it org creation. That is fine for a PR gate and useless as an inner-loop tool — developers still work in a long-lived personal scratch org and only feel this when they push.

Was it worth it

Two days to build, and release-day deployment failures went from routine to rare. The number I did not expect: the review queue moved faster, because a reviewer who can see a green run on a real org spends less time reading the diff for deployment problems and more time reading it for actual problems.